-
Title
Rational Selection of Mining Method for High Cutting Coal Mining Face
-
作者
程建祯
-
单位
山西晋煤集团金鼎煤机矿业有限责任公司
-
摘要
针对大采高采煤工作面开采中存在的工作面间煤柱留设大、局部采高小于煤层厚度、工作面两端头三角煤过渡段留顶煤等问题,通过采用加大工作面长度、增加采高、跨巷回采、三角煤回收、改变工作面布置形式为跳采式的工作面开采顺序,实现窄煤柱回采等方式提高煤炭采出率。结果表明:大采高工作面布置及开采方式的合理选择,可以使资源采出率达到75%~80%。
-
Abstract
According to the large coal pillars left between the coal mining faces, the cutting height partially not meet the seam thickness requirement, the top coal I
eft at the transition sections of the delta seams near the face conveyor head and tail and other problems existed in the mining of the high cutting coal mining face, a min
ing process of a cross over coal mining face with a face length increased, a high cutting height increased, a cross over gateway mining, a delta seam recovery, a face la
yout changed was applied in order to realize the narrow coal pillar mining and other mining method to improve the coal mining recovery rate.The results showed that th
e rational selection of the high cutting coal mining and the mining method could make the resources recovery rate to 75%80% and the coal resources lost could be highl
y reduced.
-
关键词
大采高工作面开采方式跨巷回采三角煤回收窄煤柱回采
-
KeyWords
high cutting coal mining face;mining method;mining cross over gateway;delta seam recovery;narrow coal pillar mining;
-
相关文章