主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
掘锚机煤巷快速掘进地质适应性评价
  • Title

    Geological adaptability evaluation of rapid excavation of coalroadway with bolt-digger integrated machine

  • 作者

    刘二平马小辉林逸朋

  • Author

    LIU Erping;MA Xiaohui;LIN Yipeng

  • 单位

    陕西彬长孟村矿业有限公司

  • Organization
    Shaanxi Binchang Mengcun Mining Co., Ltd.
  • 摘要
    为提高掘锚机掘进适应性,进而提升煤矿掘进效率,以彬长矿区4对矿井掘进巷道为工程背景,通过现场情况调研及分析巷道快速掘进影响因素,确定围岩地质条件是影响4对矿井掘锚机快速掘进效率的主要因素。在此基础上,建立掘锚机快速掘进评价因素指标体系,采用层次分析法构建判定矩阵并计算各影响因素所占权重,确定煤层顶底板稳定性、断层、褶曲、陷落柱和冲击地压是影响掘锚机快速掘进适应性的主控因素。最后,对各评价指标进行分级量化,建立掘锚机快速掘进适应性评价模型,并将该模型应用于4对矿井。实践结果表明,大佛寺和文家坡煤矿评分较高,较孟村和胡家河煤矿更有利于掘锚一体机快速掘进,研究对于彬长矿区4对矿井掘锚机进行适应性改进有着重要的指导意义。
  • Abstract
    In order to improve the tunneling adaptability of bolt-digger, and boost the tunneling efficiency of coal mines.Based on the engineering background of 4 pairs of mine excavation tunnels in Binchang mining area, and through on-site investigation and analysis of influential factors on the fast tunneling of tunnels, it is determined that the surrounding rock’ s geological conditions are the main factors affecting the rapid tunneling efficiency of bolt-diggers. An index system of evaluationfactors for the fast excavation of bolt-diggers is established, and the analytic hierarchy process is used to construct a judgment matrix and calculate the weight of each influential factor. The main controlling factors of fast tunneling adaptability ofbolt-digger are the stability of roof and floor, fault, fold, collapse column and impact geopressure. Finally, each evaluation index is graded and quantified, and an evaluation model of the fast tunneling adaptability of the bolt-diggers is established,which is applied to 4 pairs of mines. The results show that the Dafosi and Wenjiapo coal mines have higher scores, which aremore conducive to the fast excavation of the bolt-digger than the Mengcun and Hujiahe coal mines. The research has important guiding significance for the adaptability improvement of the bolt-digger integrated machine in 4 pairs of mine in Binchang mining area.
  • 关键词

    煤巷快速掘进掘锚一体机适应性评价围岩地质条件层次分析法

  • KeyWords

    coal roadway fast excavation; bolt-digger integrated machine; adaptability evaluation; analytic hierarchy processs