深部矿井回风井冻结施工过程中管涌事故分析
  • Title

    Analysis on water and soil gushing accident occurred in deep mine air returning shaft during freezing construction

  • 作者

    杨健辉汤秀锋张劲松芮大虎王利

  • Author

    Yang Jianhui Tang Xiufeng Zhang JinsongRui Dahu Wang Li

  • 单位

    河南理工大学深部矿井建设重点学科开放实验室河南理工大学土木工程学院中平能化建工集团有限公司建井一处

  • Organization
    Key Subject Open Lab of Deep Mine Construction,Henan Polytechnic University School of Civil Engineering,HenanPolytechnic University First Mine Construction Division,Zhongping Energy and Chemical Construction Engineering Group Corporation Limited
  • 摘要
    为了探讨冻结法井筒施工发生管涌事故的原因,以平煤一矿北三回风井为例,在混凝土井壁出现大量不规则而且宽度和深度较大的裂缝后,结合现场测试数据、地质条件和施工工艺对管涌事故进行了综合分析。由分析结果可知,管涌事故的主要原因为:1施工工艺不合理,如冻结管孔偏斜较大,注浆压力过大,混凝土浇筑不连续而出现施工冷缝,爆破装药量过大而引起的震动,致使混凝土在终凝前后就已产生载荷型裂缝;2混凝土配比、生产与养护不合理,如混凝土没有达到实际设计强度等级,无生产、浇筑养护措施,从而无法避免大体积混凝土的质量通病,即收缩裂缝;3地质条件的限制,如事故段岩石破碎,高角度裂隙发育,裂隙承压水压力大,构造应力大;同时,裂隙承压水与井壁外侧呈点接触或线接触,从而造成应力集中,发生横截面失稳现象。
  • Abstract
    in order to discuss the causes of water and soil gushing accident occured in a ground frezing construction of a mine shaft.based on the Norh No. 3 AirReturning Shaf of Pingmei No.1 Mine a er large abnormal and large with and depth cracks were appeared on the mine concrete lnr n comtbinaton with the site neasured data geological onditions and construction technology,a comprehensive analysis was conducted on the wa1er and soil gushing a ident .The analysis resuts showed that the major causes of the water and sall gushing accident were 1 the construcion fechnology was irationa.such as the rezing pipe borehole was too delecton.the grouting prssure was too igh.the concrete pouring was not continuous and the constrution cold joits ocured, overchaging of the exphosive lcaded caused lbration and theconcrete before and afer the fial sting would cause theloading cracks 2 the concrete mixing rato.,producton and curing were rational such as the .oncrete coud notreach the actal designed strength grade and no production and curing measures conducted,therefore lage area concrete qualt could notreach thedesigned requiremens.such the shrimkage crack 3 thelimitation of the geological co diton,he roce at the accident secion was broken,the igh angle cacks were develope.the crack pressurized water pressure was too high and the structural stress was too high .Mfeanwie the crack rssurzed water were in apoint comnection or inalinear connection with the outside of the mine sheaft and thus stress concentration occurred and the stablity lost of the cross-section was occurred.
  • 关键词

    井筒冻结法施工大体积混凝土裂缝管涌

  • KeyWords

    mine shaft; ground freezing construction; large volume concrete;cracks; water and soil gushing;

  • 基金项目(Foundation)
    国家自然科学基金资助项目(41172317);深部矿井建设省重点学科开放实验室开放基金资助项目(2011KF-01);河南省教育厅科技攻关资助项目(2010A560010);
相关问题
立即提问

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联
Baidu
map