岩巷综掘五位一体快速成巷技术研究
  • Title

    Study on five-in-one rapid excavation technology of rock roadway with fully-mechanized method

  • 作者

    肖同强李化敏涂兴子郭春生李海洋

  • Author

    Xiao Tongqiang Li Huamin Tu Xingzi Guo Chunsheng Li Haiyang

  • 单位

    河南理工大学能源科学与工程学院煤炭安全生产河南省协同创新中心平顶山天安煤业股份有限公司中国煤炭科工集团重庆研究院有限公司应急救援研究所

  • Organization
    School of Energy Science and Engineering,Henan Polytechnic University Henan ProvinceCollaborative Innovation Center of Coal Work Safety Pingdingshan Tianan Coal Co.,Ltd. Instituteof Emergency Rescue,China Coal Technology and Engineering Group Chongqing Research lnstitute Co.,Ltd.
  • 摘要
    为解决平顶山矿区岩巷掘进速度慢、采掘接续紧张的难题,分析了制约综掘成巷速度的主要因素,提出了五位一体综掘快速成巷技术体系。以24011工作面瓦斯抽采巷为例,确定了合理的巷道掘进层位与断面,建立了综掘机械化作业线,提出了"时空立体交叉施工作业"方法以及"快速支护、主动支护"围岩控制技术,开发了"精细地质探测、综合除尘、硬岩震动爆破"等保障技术,形成了"巷道层位与断面设计、设备合理选型与配套、施工工艺、高效支护、施工安全与保障"五位一体综掘快速成巷技术体系。实践表明,该技术体系实现了高效破岩、连续出矸、高效支护和有效除尘,月进尺达312 m,显著提高了岩巷掘进速度。
  • Abstract
    ln order to solve the problem of slow excavation of rock roadways and tense prospect of mining and excavation continuance in Pingdingshan Mining Are a,the main factors that constraints fully-mechanized excavation speed were studied,and a five-in-oneful -mechanized raidexcavation technological system was put forward. Taking the gas drainage roadway for the 24011 working face as an example reasonable roadway excavation horizon and section were determined; a fully-mechanized operation line was establis hed; a time-space vertical intersection constru:tion method and a rapid and active support of surounding rock control technology were proposed; a series of security techmnologies including finegeological detection,comprehensive dust removal and hard rock vibration blasting were developed; and fimally a five-inone fally-mechanized rapidexcavation technology system including roadway horizon and section design,rational selection of equipment and matching facilities ,construction echnology eficient support technology and construction safety and security was formed. The practice showed that this technology system realized high-efficiency rock breaking.continuous waste stone exhaust efficient support and dust removal.and the excavation speed was up to 312 meters per month which significantly increased the speed of rock roadway excavation.
  • 关键词

    岩巷综掘快速成巷五位一体施工工艺支护技术

  • KeyWords

    fully-mechanized excavation of rock roadway; rapid excavation;five-in-one; construction technology; support technology;

  • 基金项目(Foundation)
    国家自然科学基金青年基金资助项目(51304065);河南省教育厅科学技术研究重点资助项目(14A440004);