-
Title
Effect analysis technology of coal waste backfilled mining technology to high cutting coal mining face,
-
作者
刘正和赵通杨录胜弓培林
-
Author
LIU Zheng-he ZHAO Tong YANG Lu-sheng GONG Pei-lin
-
单位
太原理工大学山西农业大学文理学院
-
Organization
Taiyuan University of Technology College of Arts and Sciences, Shanxi Agricultural University
-
摘要
为准确评价大采高综合机械化矸石充填效果,采用理论分析、实验室试验与工程实践相结合的方法,以东坪煤矿建筑物下厚煤层资源回采为研究背景,确定了影响充填质量的评价因素,建立了大采高综合机械化矸石充填质量评价技术体系。研究结果表明:由充填开采岩层移动规律、影响充填质量的因素、质量检测参数、质量检测系统布置、质量检测评价手段等分系统组成的充填质量评价技术体系可以较准确评价充填质量,并在东坪煤矿成功进行了充填质量检测及评价,取得了显著的社会效益和经济效益,为类似条件村庄压煤采用矸石充填技术提供了指导和参考。
-
Abstract
In order to accurate evaluation on the mechanized coal waste backfilling effect of the high cutting coal mining face,a method combined with a theoretical an
alysis,lab test and engineering practices was applied to determine the factors affected to the evaluation on the backfilling quality based on the thick seam mining under the
buildings in Dongping Coal and to establish the quality evaluation technical system of the mechanized coal waste flling in the high cutting mining face. The study results sh
owed that the backfilled quality evaluation technical system consisted of the overburden strata movement law above the backfilled mining,factors affected to the backfilled
quality,quality diction parameters,quality diction system arrangement,quality detection evaluation means and other subsystem could accurately evaluate the backilled quali
ty. The backilled quality detection and evaluation was successfully conducted in Dogping Coal with obvious social and economic benefit obtained and could provide the gui
dance and references to the coal waste backilled mining technology of the seam under the vllage with similar condition.
-
关键词
村庄压煤大采高工作面矸石充填开采充填效果检测
-
KeyWords
seam under village; high cutting mining face; coal waste backilled mining; detection of backilling effect;
-
基金项目(Foundation)
“十二五”国家科技支撑计划资助项目(2012BAB13B04);山西省青年科技研究基金资助项目(2012021022-4);