• 全部
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
堤坝下矸石充填采煤充实率设计
  • Title

    Design on backfill bodyOs compression ratio in waste backfilling coal mining under dam

  • 作者

    王启春贾鹏举郭广礼查剑锋

  • Author

    Wang Qichun Jia Pengju Guo Guangli Zha Jianfeng

  • 单位

    重庆工程职业技术学院河南省地质矿产勘查开发局中国矿业大学国土环境与灾害监测国家测绘地理信息局重点实验室

  • Organization
    Chongqing Vocational Istitute of Engineering Henan Provincial Bureau of Geo-exploration and Mineral
    Development Key Laboratory for Land Environment and Disaster Monitoring of SBSM,China University of Mining and
    Technology
  • 摘要
    为达到节约矸石充填量和确保堤坝安全的双重目的,需对矸石充填采煤充实率进行合理的设计,首先通过理论分析确定矸石充填采煤充实率的影响因子及各因子的影响情况;然后以济宁三号煤矿南阳湖堤下矸石充填采煤为实例,根据南阳湖堤的特点以及采煤规范确定设防标准,通过全部垮落法沉陷预计确定矸石充填量以及充填范围,由此动态确定该湖堤下矸石充填采煤充实率。结果表明:当工作面推进到距湖堤340 m时,采空区充实率需达到15.8%,随着工作面接近湖堤,采空区充实率应逐渐提高,当工作面推进到距湖堤60 m时,采空区充实率需达到91.8%;最后根据等价采高沉陷预计地表变形,该设计充实率不但能保护地表湖堤的安全,同时还节约了矸石充填材料。
  • Abstract
    The paper aimed to ilustrate a rational design on backfill body口s compression ratio( BBCR) in waste backfilling coal mining,which could save the amount of waste backlilling and ensure the safety of dam. Firstly,the authors theoretically analyed on factors that influenced the value of BBCR and each factorDs actual effect of the BBCR. Secondly,a case studied on waste backfilling coal mining in Jining No. 3 Coal Mine under Nanyang Lake Dam to elaborate the BBCR dynamic design according to t he damDs feature and the coal mining specification to define the fortification standard and with the surface subsidence prediction using fully caving method to define the a mount and range of waste backfilling,as instance,the BBCR should be at least 15.8% when the mining face was 340 m away from the dam,and the BBCR levels up as mini ng face goes closer to the dam,the BBCR should reach 91.8% as the mining face was 60 m away from the dam.Finally,a conclusion according to the surface subsidence pr ediction using equivalent mining height model that the rational BBCR design not only ensured the safety of the dam,but also saved flling materials and provides scientific b asis for the layout of the project.
  • 关键词

    开采沉陷矸石充填开采充实率等价采高

  • KeyWords

    mining subsidence; waste backilling coal mining; backfill bodyOs compression ratio; equivalent mining height;

  • 基金项目(Foundation)
    国家科技支撑计划资助项目(2012BAB13B03);国家自然科学基金青年基金项目(41104011);
  • 相关文章
相关问题
立即提问

主办单位:煤炭科学研究总院有限公司 中国煤炭学会学术期刊工作委员会

©版权所有2015 煤炭科学研究总院有限公司 地址:北京市朝阳区和平里青年沟东路煤炭大厦 邮编:100013
京ICP备05086979号-16  技术支持:云智互联
Baidu
map