-
Title
Study on overburden strata activity law for mining in sectional seam of steep inclined ultra thick seam
-
作者
周保精
-
Author
Zhou Baojing
-
单位
中国神华能源股份有限公司总工程师办公室
-
Organization
Chief Engineer Office,China Shenhua Energy Company Limited
-
摘要
为了揭示急倾斜特厚煤层水平分段综放开采条件下的覆岩活动规律,采用相似材料模拟试验,研究了不同水平分段开采后急倾斜煤层覆岩破坏过程、应力场变化和顶板沉陷规律。研究表明:覆岩的破裂经历裂隙产生、顶板离层、离层扩展、顶板垮落4个过程,自然垮落条件下,急倾斜煤层覆岩垮落存在滞后性,悬顶破断可能引发顶板大面积垮落、冲击地压等动力灾害;覆岩垮落移动时,顶板局部应力畸变,出现拉应力,底板压应力呈线性增加,直至破坏失稳;覆岩顶板离层量自下往上逐渐减少,岩层垮落后,顶板下沉最大位置沿倾斜方向向上方转移,直至地表沉陷。
-
Abstract
In order to reveal the overburden strata activity law under the fully-mechanized top coal caving mining in the horizontal sectional seam of the steep inclined
ultra thick seam,a similar material simulation test was applied to study the overburden strata failure process,stress field variation and roof subsidence law of the steep incli
ned thick seam after the mining in deferent horizontal sectional seam. The study showed that the fracturing of the overburden strata had a cracking occurrence,roof bed se
paration,bed separation expansion,roof falling processes.Under the condition of the natural roof falling,a delay was existed in the overburden strata falling of the steep incli
ned thick seam and the suspended roof breaking could cause a large area roof falling,roof strata bumping and other dynamic disaster.During the overburden strata falling a
nd displacing,local stress of the roof would be distortion,a tensile stress would be appeared,the floor pressure stress would be increased in a linear and then until the roof f
ailed and the stability lost.The roof separation quantity of the overburden strata would be steadily decreased from the bottom to the top.After the rock strata failed,a larger |
ocation of the roof subsidence would be upward migrated along the inclined direction,until the surface ground subsided.
-
关键词
急倾斜特厚煤层水平分段放顶煤覆岩活动应力场
-
KeyWords
steep inclined ultra thick seam; horizontal sectional top coal caving; overburden strata activity; stress field;