• 全部
主办单位:煤炭科学研究总院有限公司、中国煤炭学会学术期刊工作委员会
水力压裂-水力割缝联合增透技术应用
  • Title

    Application of permeability improving technology combined with hydraulic pressure fracturing and hydraulic slotting

  • 作者

    李宗福孙大发陈久福雷洪波肖宋强

  • Author

    Li Zongfu Sun Dafa Chen Jiufu Lei Hongbo Xiao Songqiang

  • 单位

    重庆市能源投资集团公司重庆松藻煤电有限责任公司重庆大学煤矿灾害动力学与控制国家重点实验室

  • Organization
    Chongqing Songzao Coal and Electric Power Company Limited,Chongqing Energy and Investment Group Corporation
    National Key Lab of Mine Disaster Kinetics and Control,Chongqing University
  • 摘要
    针对重庆松藻逢春煤矿高构造应力区域煤层透气性差、钻孔垮孔严重、瓦斯抽采浓度低等问题,在预抽煤层瓦斯时采用水力压裂-水力割缝联合增透技术,分析了该技术的增透原理,并在张狮坝采区+680N11203回风巷-2区钻场进行了对比试验。结果表明:水力压裂-水力割缝联合增透技术与水力压裂技术、水力割缝技术和普通钻孔抽采技术相比,明显增加煤层的透气性,提高瓦斯抽采浓度和抽采效果;初次抽采瓦斯体积分数为28%~62%,较其他3种方案依次提高了8%~13%、12%~20%和18%~36%;汇总瓦斯体积分数为36%,依次是其他3种方案的1.33、1.8、5.1倍;水力压裂-水力割缝联合增透技术能保持长时间的高效抽采时间,抽采28天后,其瓦斯累积抽采量为7 908m3,分别是其他3种方案的1.5、1.7、7倍,且该钻场汇总浓度基本无衰减趋势,仍保持在36%左右。
  • Abstract
    According to the poor seam permeability,serious borehole collapsing,low concentration of the gas drainage and problems of the high tectonic stress area in Fengchun Mine of Chongqing Songzao Company,during the gas pre- drainage period,the permeability improving technology combined with hydraulic pressure fracturing an d hydraulic slotting was applied,the permeability improving principle of the hydraulic pressure fracturing and hydraulic slotting technology was analyzed and the comparison tests of the technology were conducted in No.- 2 Block drilling site of the air returning gateway in No. + 680N11203 coal mining face of Zhangshiba Mining Block. The resul ts showed that in comparison with the hydraulic pressure fracturing technology,hydraulic slotting technology and conventional borehole gas drainage technology,the perme ability improving technology combined with the hydraulic pressure fracturing and hydraulic slotting could obviously improve the permeability of the seam and improve the g as drainage concentration and the gas drainage effect. The volume fraction of the first gas drainage was 28% ~ 62% and was 8% ~ 13%,12% ~ 20% and 18% ~ 36% times higher than other three plans individually. The total volume fraction of the gas drainage was 36% and was 1. 33,1. 8 and 5.1 times higher than other three plans individuall y. The permeability improving technology combined with the hydraulic pressure fracturing and hydraulic slotting could keep a long time of the high efficient gas drainage. Af ter 28 days of gas drainage operation, the accumulated volume of the gas drainage was 7 908 m3 and was 1. 5,1.7 and 7 times higher than other three plans individually. T he total concentration of the gas drainage in the drilling site was not in an attenuation tendency basically and could be kept at about 36%.
  • 关键词

    低透气性水力压裂水力割逢煤层增透瓦斯抽采

  • KeyWords

    low permeability; hydraulic pressure fracturing; hydraulic sltting; seam permeability improvement; gas drainage;

  • 基金项目(Foundation)
    国家科技重大专项资助项目(2011ZX05065);国家自然科学基金资助项目(51374258,51504046);